国模月月大尺度私拍,成人欧美一区二区三区视频不卡高清版在线,久久夜色撩人精品国产av全集在线观看,欧美成人高清ww完整版免费播放,日本乱理伦片带中文字幕,亚洲福利在线观看,色欲av无码人妻精品网站久久,漂亮人妻被老板疯狂进入メイリン,国产精品加勒比

 

Huawei Tuanbowa No. 8 Plot Phase I Electromechanical Engineering

Construction time: July 10, 2019 - August 31, 2020

Building area: 350,000㎡

Product features: 5G mobile phone production plant

Scope of contracting: Electromechanical professional contracting: electromechanical engineering for workshops 1-4, basement and dangerous goods warehouse

Category:

Project highlights:Huawei Tuanbowa No. 8 Plot Industrial Project (Phase I) covers an area of about 529 mu, and the floor areas above the ground and under the ground are 270,000㎡ and 80,000㎡ respectively, with a planned investment of RMB 2 billion. It mainly builds a terminal manufacturing plant with an annual production capacity of 120 million mobile phones and other terminal consumer goods, precision devices and parts, which can support the future sales scale of Huawei's terminal products.

Industry value:this project is the first fully automatic mobile phone assembly plant of Huawei, with a relatively high impact in the industry. Our company is mainly responsible for the electromechanical package.

 

 Aerial view  Aerial view 
  • toolbar
    Back to Top