国模月月大尺度私拍,成人欧美一区二区三区视频不卡高清版在线,久久夜色撩人精品国产av全集在线观看,欧美成人高清ww完整版免费播放,日本乱理伦片带中文字幕,亚洲福利在线观看,色欲av无码人妻精品网站久久,漂亮人妻被老板疯狂进入メイリン,国产精品加勒比

 

Beijing Benz Auto Power Battery Assembly Joint Plant Process Pipeline Project

Construction time: October 28, 2018 - April 25, 2019

Building area: 56,000㎡

Product features: car batteries with high energy densities

Project awards: Outstanding Contribution Award for Quality Management

Scope of contracting: construction engineering, holder engineering, electrical engineering, compressed air engineering, cooling water engineering, ventilation engineering

Category:

Project highlights: Beijing Benz Auto Power Battery Assembly Joint Plant features a total building area of 56,347m2 and covers an area of about 49,000m2. To ensure the excellent safety performance and quality of the power batteries, the Beijing Benz Power Battery Plant strictly follows the Mercedes-Benz integrated global quality management system and adopts many cutting-edge manufacturing processes. In addition, focusing on the manufacturing concept of being "digital, flexible and green", on the basis of technologies such as big data analysis and IoT, this plant has also introduced intelligent manufacturing, intelligent logistics, digital operation, intelligent energy management and other systems, as well as photovoltaic power, solar energy and other clean energies to ensure the efficient, accurate, flexible and environmental friendly production process. At present, as the first Mercedes-Benz power battery plant that has been put into production outside Germany, the power batteries produced by this plant have been successfully delivered internally.

Industry value:the company was mainly responsible for the construction engineering, holder engineering, electrical engineering, compressed air engineering, cooling water engineering, ventilation engineering, etc. of this project.

 

 Aerial view    Delivery and production ceremony

Project awards

Outstanding Contribution Award for Quality Management

  • toolbar
    Back to Top